GET kqed.org HTTP 200433 ms6.5 KB$0.000311 captured Aug 7, 2026
kqed.org, as data
One API turns any kqed.org page into markdown, structured JSON, its link graph or a screenshot, and crawls the whole site the same way. The panel shows the real response we captured.
- Render mode
- Plain HTTP, no browser needed
- Response
- HTTP 200 in 433 ms
- Page size
- 6.5 KB of markdown, 51 lines
- Fields
- Business Name, Address, Phone, Category and 1 more
- Captured
- Aug 7, 2026
Free balance on signup, no card. This kqed.org page cost $0.000311 to fetch.
Former Oakley Councilmember Brad Nix pointed to what he described as a massive jobs-to-housing imbalance in east Contra Costa County.“The number one issue Oakley has always had has been jobs,” he said. “This is an opportunity to address that.”When the applicant’s representative Jason Bennett, a principal with development firm JB2 Partners, rose to address the council, he acknowledged the community’s concerns and announced the developer was pulling data centers from the project entirely.“We have certainly heard the concerns of the community and, in line with the fact that that was never our principal strategy to develop data centers here … I respectfully request a modifier application to remove [the] data center from … the application in its entirety,” he said.Bennett’s announcement drew cheers and immediately shifted the council’s deliberations.“I was not in any way ready to support this project with the data centers in it. I just think that it wasn’t something that my constituents were going to support,” Councilmember Shannon Shaw said, before casting her ‘yes’ vote. “It made this a whole lot easier.”The soon-to-be-uprooted vineyards belong to Fred Cline of Cline Family Cellars, who also owns Oxfoot Oakley LLC. The family claims the vineyards have reached the end of their lifespan.Even as the data center’s opponents claimed a partial victory, Oakley resident Savioso Ramirez worried the chemical runoff from the project in any form could threaten the local salmon population, and that increased truck traffic would worsen air quality.“Regardless, if the data center is built there or not, we want to be clear that it will be devastating to the environment,” Ramirez told KQED.*KQED’s **Spencer Whitney** contributed to this report.* What Spider does on kqed.org
Same key, five endpoints. The numbers under a cell were measured on this page.
Page to markdown
Clean text for RAG and LLM context, boilerplate removed. The lane that runs without a key.
433 ms · $0.000311Page to JSON
Spider reads the page and names the fields. Pass your own schema when you need exact keys.
Rendered capture
Real Chromium, full-page PNG. The same call also returns the rendered HTML.
The call behind the panel
This request produced the response above. Paste it with your key and you get the same bytes.
curl -X POST https://api.spider.cloud/scrape \
-H "Authorization: Bearer $SPIDER_API_KEY" \
-H "Content-Type: application/json" \
-d '{"url": "https://www.kqed.org/news/12076074/oakley-drops-data-center-plans-approves-massive-industrial-project", "return_format": "markdown"}' from spider import Spider
app = Spider()
params = {"return_format": "markdown"}
page = app.scrape_url("https://www.kqed.org/news/12076074/oakley-drops-data-center-plans-approves-massive-industrial-project", params=params)
print(page[0]["content"]) import { Spider } from "@spider-cloud/spider-client";
const app = new Spider();
const [page] = await app.scrapeUrl("https://www.kqed.org/news/12076074/oakley-drops-data-center-plans-approves-massive-industrial-project", {
return_format: "markdown",
});
console.log(page.content); What kqed.org costs
Multiplied from the measured 6.5 KB page. Estimates round to the cent.
1 GB of transfer costs $1, plus $0.001 per CPU minute, and failed requests cost $0. Crawling daily? The Unlimited plan is a flat monthly rate.
Point this at the rest of kqed.org.
The capture above took 433 ms and cost $0.000311. The same call takes any URL on kqed.org.